Shengli External Coal Handling System
The Shengli No. 1 open-pit mine to power-plant system is an 8.6 km enclosed conveyor with a middle-drive arrangement. The upper branch has a capacity of 3,000 t/h and the lower branch 500 t/h; the local minimum temperature is −42.2°C. Both branches support continuous material transport.