The Anhui transport group Dongzhi project links the mine processing area, Shenlongshan transfer station and industrial-park terminal. The corridor is 27.35 km long, with a maximum belt width of 2,400 mm, seven transfer stations, capacity of 13,500 t/h and design speed of 5.0–6.3 m/s. Planned annual corridor transport is 80 million tonnes; the wider development includes a 60-million-tonne processing park and 46-million-tonne terminal.
The wider development is based on the Kejiacun mine, with reserves of 650 million tonnes. The conveyor corridor connects the mine processing area, Shenlongshan transfer station and the industrial park’s terminal.