Russian Oriental Port Phase III
KDHI supplied belt conveyor equipment for the Phase III coal-loading terminal project at Russian Oriental Port, working with Mitsui Miike of Japan. The project scope covered both new conveyors and upgrades to existing conveying equipment.
The equipment package includes 29 new belt conveyors and three upgraded conveyors. The new conveyors have a combined length of 4,890 m, with a belt width of 2,200 mm, a belt speed of 3 m/s and a conveying capacity of 3,300 tonnes per hour.
The project combines new equipment supply with conveyor refurbishment within a coal terminal handling system, demonstrating KDHI’s experience in supporting international port infrastructure projects.